Power fleet electrification without waiting for the grid.

Distribution centres, depots and ports have large roofs, heavy equipment and fast growing demand from electric fleets. Grid capacity is often the biggest barrier to growth.

The challenges

What the sector is facing.

Fleet electrification

Charging electric HGVs, vans and port equipment needs far more power than most sites have.

Grid connection delays

Upgrades can take years and cost millions.

24/7 operations

Warehouses, cold chain and terminals cannot afford downtime.

High peak demand

Charging, lighting and handling equipment create costly peaks.

Customer and regulatory targets

Shippers and operators face pressure to decarbonise.

Why behind-the-meter matters

Energy you generate, store and control on site.

Generating and storing energy on site creates capacity you control, so you can electrify fleets and expand operations without waiting for a grid upgrade.

Smart controls schedule charging around operations and prices, and large roofs become a source of low-cost power.

How we help

One partner from assessment to operation.

  • Capacity and fleet charging plans based on your real data.
  • Funded infrastructure, so electrification does not need upfront capital.
  • Delivery planned around live operations.
  • Motion-to-Energy options for high-traffic sites, through our ViaGen™ systems.

Get in touch

See what on-site energy could do for your site.

Share your half-hourly data and we'll model your savings, free and with no obligation.