Installation Process

The ViaGen Road – CLC system was deployed in areas of controlled vehicle deceleration, ensuring optimal energy capture without disrupting logistics flow. ViaGen Heavy was installed in high-HGV-volume zones, maximizing power generation from larger vehicle loads. Both systems were integrated with the site’s energy infrastructure to deliver direct, usable power.

Monitoring and Evaluation

Following installation, real-time data was collected to measure performance. Monitoring focused on:

  • Energy Output – Quantifying electricity generation from both systems.
  • Cost Savings – Assessing reductions in energy expenses.
  • Operational Impact – Ensuring seamless integration without disrupting site activities.

Impact: The project successfully demonstrated the potential of ViaGen systems to provide sustainable energy in a logistics setting. Key outcomes include:

  • Significant power generation from vehicle movements, reducing reliance on external energy sources.
  • Lower energy costs, improving operational efficiency for site users.
  • Enhanced sustainability by capturing kinetic energy that would otherwise be lost.

This project highlights the role of ViaGen Road – CLC and Heavy in supporting logistics centres to achieve cost-effective, clean energy solutions while meeting regulatory sustainability targets.

To achieve a significant reduction in your existing energy usage and value on your investment, it is important that you get the right product for your site.

Enquiries