Millennium Hilton Church St

Lower Manhattan, New York · Cogeneration under Discount Energy Service

500 kW

Cogeneration

Integrated with existing heating plant

$200k+

Saved every year

On a top-three operating cost

Zero

Capital outlay by the hotel

Turnkey delivery and operation

What we delivered

  • 500 kW cogeneration system installed and commissioned at the Lower Manhattan property.
  • Integrated with the existing heating and domestic hot water systems to capture recovered heat.
  • Turnkey delivery from design through commissioning, then ongoing operation and maintenance.

Value to the customer

  • Over $200,000 a year of savings on a property where energy is a top-three operating cost.
  • No capital outlay, no plant procurement and no performance risk taken by the hotel.
  • Generation behind the meter improves resilience against grid interruption in a dense urban network.

Role

Fund, own and operate

Structure

Discount Energy Service Agreement

Status

In service since December 2020

The smallest of the three New York cogeneration plants, delivered on a constrained Lower Manhattan site.

Figures include operational results and modelled opportunities. Savings are project-specific, not guarantees of outcomes for new customers.